26.03.2013 - 06:57 GMT
Slop Disposal, Ballast Reception and Ballast Exchange Costs
With effect from the 1999 Worldscale Schedule, there is no reflection in the flat rates of the costs incurred for discharging slops and ballast water. A Note in the Preamble states: "No allowance i...... Login to view this article
25.03.2013 - 12:05 GMT
Load Line
The Worldscale Associations do not take into account the effect of load line regulations on cargo capacity. The variations in permitted full load, dependent on summer or winter, and the various loa...... Login to view this article
25.03.2013 - 12:02 GMT
Part Cargo in Rotterdam
The Rotterdam Harbour Dues are based not only on the size of the vessel, but also partly on the quantity discharged or loaded. As one needs to know the exact quantity loaded or discharged at...... Login to view this article
25.03.2013 - 11:59 GMT
Definition
The Worldscale Preamble states that rates are calculated and quoted in USD per tonne for a full cargo for the Standard Vessel. All rate calculations are based on the nominal tanker with a carrying...... Login to view this article